Domestic PV industry development is bottoming out


Since last year, with the introduction of the European and American double-reverse policies, the development of the domestic photovoltaic industry has fallen to the bottom. As a major province of the photovoltaic industry, the Jiangsu provincial government has decided to implement a new round of photovoltaic power generation support policies, as much as possible, to help enterprises tide over the difficulties. Resolve the contradiction between supply and demand of photovoltaic products in the province, and help enterprises to cope with the adverse effects of double adverse effects more effectively.
Specifically, the province refers to the subsidy standard determined by the new one-wheel photovoltaic power generation support policy, and expands the total photovoltaic power generation capacity of the province this year by 400MW on the basis of the original provincial subsidy of 200MW. The new scale is set by province and locality as follows: The ratio of 1 is subsidized.
On the other hand, on the basis of the national unified on-grid tariff, the province has increased the additional subsidies for photovoltaic power generation prices, and clarified that during the period of 2012-2015, the non-state financial subsidized photovoltaic power generation projects newly put into operation in the province will be ground, roof, and Building integration, the on-grid price per kWh was determined to be 1.3 yuan in 2012, 1.25 yuan in 2013, 1.2 yuan in 2014 and 1.15 yuan in 2015, respectively, 0.3 yuan higher than the national level, 0.25 yuan, 0.2 yuan and 0.15 yuan, provincial level. Each year, the financial sector allocates 160 million yuan from the special funds for strategic emerging industries.
Relevant persons from the Finance Department of Jiangsu Province said that the implementation of this policy has effectively alleviated the pressure on corporate capital turnover, mobilized the enthusiasm of Jiangsu province's solar power generation enterprises, and promoted the development of the province's photovoltaic industry.
In addition, in order to help photovoltaic enterprises to survive the cold winter, promote the growth of domestic demand, and promote the construction of two-type society, the central government will accelerate the construction of the Golden Sun demonstration project. Jiangsu Province also took this opportunity to increase the support for the central special funds and strive for 7 solar photovoltaics. The project received 73.7 million yuan of demonstration subsidies for photovoltaic building applications, with an installed capacity of about 18 megawatts, accelerating the application of solar photovoltaic in urban and rural construction; organizing the application for three batches of Golden Sun demonstration projects, a total of 59 projects were approved, with a total installed capacity of 647,067. In kilowatts, the central government subsidy fund was 3.559 billion yuan, and the number of selected projects, installed capacity and total subsidy funds ranked first in the country.

NTN Bearing

NTN Bearing,NTN Ball Bearing,NTN Deep Groove Ball Bearing

Kaiming Bearing Co., Ltd , http://www.jn-thrustBearings.com