The use of non-standard ripple compensator

National standard corrugated compensator installation

1, the national standard corrugated compensator should be checked before installation, model, specifications and pipeline configuration, must meet the design requirements.

2. For the compensator with inner sleeve, attention should be paid to aligning the direction of the inner sleeve with the direction of the medium flow, and the hinge plane of the hinge-type compensator should be consistent with the plane of displacement and rotation.

3, need to be "cold tight" compensator, pre-deformation of the auxiliary components should be installed after the pipeline can be removed.

4. It is strictly forbidden to use corrugated compensator deformation method to adjust the installation of pipelines to be out of tolerance so as not to affect the normal function of the compensator, reduce the service life, and increase the load of piping, equipment, and support components.

5. During the installation process, welding slag must not be allowed to splash on the surface of the wave shell, and the wave shell must not be subjected to other mechanical damage.

6. After installing the piping system, remove the yellow auxiliary positioning components and fasteners used for installation and transportation on the corrugated compensator as soon as possible, and adjust the position limiting device to the prescribed position according to the design requirements so that the piping system has the environmental conditions. Full compensation ability.

7. All moving elements of the compensator shall not be jammed or restricted by the external components. The normal movement of the active parts shall be ensured.

8. In the hydrostatic test, the secondary fixed pipe rack equipped with the end of the compensator pipe should be reinforced so that the pipeline does not move or rotate. For the compensator used in gas media and its connecting pipe, pay attention to whether it is necessary to add a temporary support when filling water. The 96 chloride ion content of the hydrostatic test water washing solution does not exceed 25 PPM.

9. After the hydrostatic test is completed, the water in the shell should be drained as soon as possible and the inner surface of the shell should be blown dry quickly.

10. The insulation material in contact with the compensator bellows shall not contain chlorine.

Henan Yichang Pipeline Equipment Co., Ltd. mainly produces corrugated compensators and other products. Website: http://, sales telephone 0371-64032783

Machinery Parts is namely machine parts, it is basic components of machine. 

Since the present of machine, the corresponding mechanical parts appear. But as also be a discipline, machinery parts separated from the mechanical structure and mechanics. With the development of mechanical industry, new design theory and method, new materials, new technology all appear one after another, then machinery parts entered a new stage of development. Theories such as finite element method and fracture mechanics, elastic hydrodynamic pressure lubrication, optimization design, reliability design, computer aided design (CAD), entity modeling (Pro, Ug, Solidworks, etc.), system analysis and design methodology has been gradually used in the research and design of machinery parts. Better combination of a variety of disciplines, combination of macro and micro to search new principle and structure, more dynamic and precise design, more efficient use of the electronic computer, the further development of design theory and method, is the important trend in the development of the discipline.

Machinery Parts

Machinery Parts,Aluminum Die Casting Machinery Parts,High Precision Machinery Parts,Machine Part

NINGBO ZHENHAI BOLANG METAL PRODUCT FACTORY , https://www.blcastings.com