Shanghai Factory EPS Sandwich Panel Production Machine

  • Model NO.: AF-820
  • Certification: CE
  • Customized: Customized
  • Name: EPS Sandwich Panel Making Machine Line
  • Machine Size: 24m*2.5m*2m
  • Life Long: 10years
  • Cutting Type: Hydraulic
  • Size of Container: 2* 40gp
  • Trademark: Aofa
  • Specification: AF-S980
  • HS Code: 84552210
  • Tile Type: Colored Steel
  • Condition: New
  • Transmission Method: Machinery
  • Machine Color: as Require
  • Machine Weight: 20t
  • Control System: PLC
  • Driven Type: Chain
  • Roller Material: 45#Steel
  • Transport Package: Normal
  • Origin: Shanghai
Shanghai Factory EPS Sandwich Panel Production Machine

Other machine we manufacture
Cold roll forming mahcine, color steel roll forming machine, roof and wall panel machine, decking floor roll forming machine, floor decing forming mahcine, stud and track roll forming machine, Z and C purlin machine, highway guardrail roll forming machine, cable tray machine, and so on.

Machine components:
Rigid board feeding rolling rack 2PCS.
Glue drop and sweep system 2PCS.
Air cylinder press frame and conveying structure 2PCS.
Laminating rolling machine 2PCS.

Summary
1. Energy saving
You can save air-conditioning and heating expenses remarkably, thanks to its excellent insulation effect as mush as 4.2 times of cement brick.
2. Perfectly insulated and waterproof
Using the high-density EPS, it is moisture and noise free.
3. Semi-permanence and easy installation
Using galvanized steel sheets treated with fluorine and silicone on the surface, it is unchangeable and semi-permanent. Due to the standardized products, you can save the cost for construction by hiring the least number of workers and minimizing the period of construction.
4. Excellent lightness and firmness
It is light but firm, so even a house is simply built, it is strong enough. Coating with different material, you can enjoy various type of panels.

Specifications:
Power supply: AC380/50-60Hz
Total power: 32KW
Production line speed: 4-8m/min
Equipment overall dimensions: 45000X2600X2800
Product width: 1000mm 1200mm
Product thickness: 50-300mm
Annual output: 600 thousand square meters
 
Terms
Payment  type 30%  T/T  prepaid  and  balance  should  be  paid  before  loading
Delivery  time 60days after receving advance payment.
Guarantee  period 18monthes  free  service/  pay  service  all  the  machine  life 
Installation  and  training If  buyers  visit  our  factory  and  check  the  machine,  
we  will  teach  you  how  to  install  and  use  the  machine,  
and  also  train  your  workers/technician  face  to  face.
Without  visiting, we  will  send  you  user  manual  and 
video  to  teach  you  to  install  and  operate.
If  buyer  needs  our  technician  to  go  to  your  local  factory,
please  arrange  board  and  lodging  and  other  necessary  things.

MACHINE PHOTOS 
Shanghai Factory EPS Sandwich Panel Production Machine  Shanghai Factory EPS Sandwich Panel Production Machine
Shanghai Factory EPS Sandwich Panel Production MachineShanghai Factory EPS Sandwich Panel Production Machine

Packing and loading photos 
Shanghai Factory EPS Sandwich Panel Production Machine

Contact:
Abby Song
 
MOB: +86-18701854523
TEL: +86-21-67298619
 
Website:http://shaofa.en.alibaba.com
        http://www.shafjx.com
Shanghai Factory EPS Sandwich Panel Production Machine

Direct-flow Liquid Filling Machine

How to adjust the machine:

1. To replace different types of bottles, the mechanical position of the filling bottle cylinder, the filling bottle cylinder, the filling bottle electric eye, the filling bottle electric eye, the bottle cylinder and the filling nozzle must be adjusted.
2. Filling the bottle with the electric eye must be aligned with the bottleneck of the last bottle. That is, when the bottle is automatically run, the 8th bottle must be placed in the range of the electric eye to be filled into the bottle. The bottle is not cut until the time set by the [Pilling Time" (set in the [Parameter Setting" of the HMI) is reached before the electric eye.
3. Filling and filling the bottle electric eye is installed in the slightly right position of the cylinder of the bottle. When the bottle is started, the cylinder of the bottle is extended, and the cylinder of the filling bottle is retracted; after a number of bottles (which can be set in the [out of the bottle interval" of the human-machine interface), the bottle is retracted and the bottle is started. After all the bottles have gone out (after filling out the bottle electric eyes), the filling bottle cylinders are extended.
4. When filling the bottle and discharging the bottle, the electric eye must be counted in 8 numbers before proceeding to the next step. The user can observe whether the number of bottles and bottles is 8 in the automatic operation screen of the man-machine interface

Direct-Flow Liquid Filling Machine,Fruit Jam Filling Machine,Sause Filling Machine,Juice Filling Machine

Guangdong Xtime Packaging Equipment Co., Ltd. , https://www.xtimepackaging.com