Injection Mould/Plastic Mould/Refrigerator Plastic Injection Mold (HRD-Z092903)

Model NO.: HRD-Z092903
Runner: Cold Runner
Design Software: UG
Installation: Fixed
Certification: ISO
Standard: HASCO
Customized: Customized
Mold Life: No Less Than 500k Shots
Customer: Haier, Hisence, Midea
Mould Material: 2738, Nak80, 718, 738h, 2344, S136, SKD11
Mould Base: Lkm, Hasco, Stiehl
Trademark: Higrade
Transport Package: Carton
Specification: ISO9001: 2008
Origin: Qingdao,Shandong Province
HS Code: 3926909090
Mould Steel:2738HH,NAK80,738,2344,S136,SDK61,P20,PX5 etc.
Mould Life:50~100 shots
Material: PP
Cavity: 1*1
Applicable range: Automotive  
Lead Time: 35-45 days
Hot runner:Yes (according to the customer's request and product style)
Standard part: PUNCH, MISUMI
First trial equipment: 380T Injection Machine( moreover we also have 90-700T,750-1300T Injection Machine. There are robots for each 90-380T Injection Machine to meet the customer's bulk production requirement.
Our service: product and mould design, Injection mould and parts machining.
Our main customer: Haier, Hisense, Midea, Siemens, SANYO, ELX, Toyota, Kia, Foton, GM Wuling, Great wall, Hyundai, Skyworth.
 Overseas market: Japan, Korea, Thailand, Russia, Germany, England, Norway, Italy, USA, Spain, Turkey, Denmark, Brazil, Argentina, Egypt, South Africa, Iran,Pakistan,India.
Mould painting: according to Customer's request
Packing: Wooden Case
 
Item Description
Key words Refrigerator mould, cooler mould, freezer mould, icebox mould, fridge mould
Relevant products Moulds for refrigerator top cover, refrigerator drawer, refrigerator bottom, refrigerator strong back and refrigerator pull handle.
Mould material 2738, NAK80, 718, 738H, 2344, S136, SKD11 etc.
Mould base LKM,   HASCO, STIEHLetc.
Cavity Single/Multiple
Runner Cold/Hot runner (Yudo, Mastip, Mold master, Synventive etc. )
Drawing format . igs, . step, . x_t, . pdf, . dwg, . dxf,
Plastic material ABS, PA, PA66, PA6+GF, PC, PE, PP, PMMA, PS etc.
Mould life 100, 000 to 3, 000, 000 shots
First trial time 30~45 days after mould structure drawing confirmed