Double Layer Glazed Tile Corrugated Steel Roof Roofing Sheet Roll Forming Machine with Good Quality and Lower Price

Model NO.: HKY
Type: Roll Forming Machine
Trademark: HKY
Transport Package: Export Packing
Specification: 9.2*1.5*1.4M
Origin: China
HS Code: 8474801000
Model NO.: HKY
Type: Roll Forming Machine
Trademark: HKY
Transport Package: Export Packing
Specification: 9.2*1.5*1.4M
Origin: China
HS Code: 8474801000
                      Double Layer building materials glazed tile Roofing Sheet Roll Forming Machine 

Components of whole set cold roll forming machine:
The De-coiler
Coil Sheet Guiding and Adjusting Equipment
Film Covered Device
Main Roll Forming System
Post-Cutting Device
Hydraulic Station
PLC Control System
Support Table
Double Layer Glazed Tile Corrugated Steel Roof Roofing Sheet Roll Forming Machine with Good Quality and Lower Price
Double Layer Glazed Tile Corrugated Steel Roof Roofing Sheet Roll Forming Machine with Good Quality and Lower Price
Double Layer Glazed Tile Corrugated Steel Roof Roofing Sheet Roll Forming Machine with Good Quality and Lower Price

Technical parameters of export standard cold roll forming machine:
Manual Un-coiler ◊ Max Capacity: 5000kgs            
â—Š Inner diameter of coil: 400-600mm
â—Š Manual with brake
Leveling Device â—Š Ensure the material level and straight
â—Š The width can be adjusted
Auto Main Forming System ◊ Max Feeding width:1220 mm 
◊ Product width: 1000 & 1020 mm 
◊ Thickness of sheet: 0.2-1.0mm 
â—Š Motor Power: 5.5 kw forming system
◊ Roller material: C45 steel 
◊ Diameter of shaft: Upper level 95 mm 
◊ Forming station: Upper level 12 stations. 
◊ Base Frame: 360 H steel welded..
Hydraulic Cutting Device â—Š Cutting way: pause to cut.
â—Š Oil pump station 1set.
◊ Hydraulic power: 4 kw hydraulic system.
â—Š Blade Material: CR12 with heat treatment HRC60-62.
Electrical System ◊ Control system: HMI & PLC control panel. 
â—Š Power: 440V 50Hz (as per local requirement)
Run-out Table â—Š Frame: 8# steel groove welded
â—Š Roller type.

Packing & Delivery
> Plastic Packing / Common Packing. Water-proof, Rust Prevention and Dust Prevention.
> By sea or other ways. In general, by sea, the port of loading is XINGANG PORT. It is only need 2 hours from our Company and Factory to Xingang Port, Tianjin City.

Our Company
Botou Huikeyuan Engineering Control Co.,Ltd was founded in 1989 and has become a recognized leader in the manufacture of Cold Roll forming machines and equipments
Our excellent reputation for sound and innovative engineering and 20 years of experience have brought us recognition for offering our customers the ultimate in efficiency for roll forming equipments and toolings

Why choose us?
1.We can make and design all kinds of roll forming machine according to customer's requests.
2.This is a very perfect and durable equipment. We have more than 13 years experiences.
3.This kind of machine has the best quality and the best price. It has accurate measurement and easy operating.
4.We can design and manufacture the special type machine according to the customers' requirement and we could provide technical guiding, production, installation, debugging and maintenance service to all customers.
5. Our product has been exported to many regions and won high reputation because of the high quality and reasonable price.
Our customers
HKY, as a well known brand name of a roll forming equipments manufacturer in China, has exported its equipments and machines to more than 60 countries and areas over the world, such as Russia, India, UK, Australia, USA, KZ, TJK, Malaysia, Nigeria, Romania, Albania and it has received excellent reputation. In the future, we are committed to better equipments and sales service and meeting customers' requirements when and where they need.

FAQ
Q: How can I contact you?
A: Please look at my contact card. You can talk to me anytime. Or send me enquiry email, I will reply you in 24 hours and offer the optimum solution to you
Q: What is the status of After-sale Services for customers and machineries?
A: Engineers available to service machinery overseas. But the customers/buyer should pay for installation and commissioning fee 100$/day to our point account. We will provide the technical support for the whole life of the equipment and free training.
Q: How to visit our company?
A: 1.Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
2.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),then we can pick up you.
3.Fly to Guangzhou aiport: By air From Guangzhou to Beijing airtpot; By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
Q: How many years since you have been in this field?
A: Our company has been producing roll forming machines for almost 20years.We have rich experience for manufacturing and designing the machine.

Our Service
> Warranty: 2 Years.
During the warranty period, it covers all spare parts of machines, if you find some spare parts were damaged,
those new spare parts will be supplied free by us, but normal wear and tear excepted. And the freight should be bore equally by both parties.
> We could provide technical guiding, production, installation, debugging and maintenance service to all customers. After the end of the warranty period, it's not free.
> We will provide the technical support for the whole life of the equipment.
>TERMS: 
1. Delivery: in stock
2. Package: Export Standard package for container
3. Payment: TT(30% by TT in advance, 70% by TT after you inspect the machine )
4. Validity: good for 30days


Contact me:

Lisa Yang (Sales Manager)
BOTOU HUIKEYUAN ENGINEERING CONTROL CO.,LTD
Phone:+86 15612755608
Add: Fuzhuang Development Zone Botou City, Hebei, China

we warmly weclome you to visit our factory!                       Double Layer building materials glazed tile Roofing Sheet Roll Forming Machine 

Components of whole set cold roll forming machine:
The De-coiler
Coil Sheet Guiding and Adjusting Equipment
Film Covered Device
Main Roll Forming System
Post-Cutting Device
Hydraulic Station
PLC Control System
Support Table
Double Layer Glazed Tile Corrugated Steel Roof Roofing Sheet Roll Forming Machine with Good Quality and Lower Price
Double Layer Glazed Tile Corrugated Steel Roof Roofing Sheet Roll Forming Machine with Good Quality and Lower Price
Double Layer Glazed Tile Corrugated Steel Roof Roofing Sheet Roll Forming Machine with Good Quality and Lower Price

Technical parameters of export standard cold roll forming machine:
Manual Un-coiler ◊ Max Capacity: 5000kgs            
â—Š Inner diameter of coil: 400-600mm
â—Š Manual with brake
Leveling Device â—Š Ensure the material level and straight
â—Š The width can be adjusted
Auto Main Forming System ◊ Max Feeding width:1220 mm 
◊ Product width: 1000 & 1020 mm 
◊ Thickness of sheet: 0.2-1.0mm 
â—Š Motor Power: 5.5 kw forming system
◊ Roller material: C45 steel 
◊ Diameter of shaft: Upper level 95 mm 
◊ Forming station: Upper level 12 stations. 
◊ Base Frame: 360 H steel welded..
Hydraulic Cutting Device â—Š Cutting way: pause to cut.
â—Š Oil pump station 1set.
◊ Hydraulic power: 4 kw hydraulic system.
â—Š Blade Material: CR12 with heat treatment HRC60-62.
Electrical System ◊ Control system: HMI & PLC control panel. 
â—Š Power: 440V 50Hz (as per local requirement)
Run-out Table â—Š Frame: 8# steel groove welded
â—Š Roller type.

Packing & Delivery
> Plastic Packing / Common Packing. Water-proof, Rust Prevention and Dust Prevention.
> By sea or other ways. In general, by sea, the port of loading is XINGANG PORT. It is only need 2 hours from our Company and Factory to Xingang Port, Tianjin City.

Our Company
Botou Huikeyuan Engineering Control Co.,Ltd was founded in 1989 and has become a recognized leader in the manufacture of Cold Roll forming machines and equipments
Our excellent reputation for sound and innovative engineering and 20 years of experience have brought us recognition for offering our customers the ultimate in efficiency for roll forming equipments and toolings

Why choose us?
1.We can make and design all kinds of roll forming machine according to customer's requests.
2.This is a very perfect and durable equipment. We have more than 13 years experiences.
3.This kind of machine has the best quality and the best price. It has accurate measurement and easy operating.
4.We can design and manufacture the special type machine according to the customers' requirement and we could provide technical guiding, production, installation, debugging and maintenance service to all customers.
5. Our product has been exported to many regions and won high reputation because of the high quality and reasonable price.
Our customers
HKY, as a well known brand name of a roll forming equipments manufacturer in China, has exported its equipments and machines to more than 60 countries and areas over the world, such as Russia, India, UK, Australia, USA, KZ, TJK, Malaysia, Nigeria, Romania, Albania and it has received excellent reputation. In the future, we are committed to better equipments and sales service and meeting customers' requirements when and where they need.

FAQ
Q: How can I contact you?
A: Please look at my contact card. You can talk to me anytime. Or send me enquiry email, I will reply you in 24 hours and offer the optimum solution to you
Q: What is the status of After-sale Services for customers and machineries?
A: Engineers available to service machinery overseas. But the customers/buyer should pay for installation and commissioning fee 100$/day to our point account. We will provide the technical support for the whole life of the equipment and free training.
Q: How to visit our company?
A: 1.Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
2.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),then we can pick up you.
3.Fly to Guangzhou aiport: By air From Guangzhou to Beijing airtpot; By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
Q: How many years since you have been in this field?
A: Our company has been producing roll forming machines for almost 20years.We have rich experience for manufacturing and designing the machine.

Our Service
> Warranty: 2 Years.
During the warranty period, it covers all spare parts of machines, if you find some spare parts were damaged,
those new spare parts will be supplied free by us, but normal wear and tear excepted. And the freight should be bore equally by both parties.
> We could provide technical guiding, production, installation, debugging and maintenance service to all customers. After the end of the warranty period, it's not free.
> We will provide the technical support for the whole life of the equipment.
>TERMS: 
1. Delivery: in stock
2. Package: Export Standard package for container
3. Payment: TT(30% by TT in advance, 70% by TT after you inspect the machine )
4. Validity: good for 30days


Contact me:

Lisa Yang (Sales Manager)
BOTOU HUIKEYUAN ENGINEERING CONTROL CO.,LTD
Phone:+86 15612755608
Add: Fuzhuang Development Zone Botou City, Hebei, China

we warmly weclome you to visit our factory!

1. What is a Semi Tipper Trailer?

Tipper Semi Trailer are also called dump trucks, dumper trailer, side tipper, tip trailer, scrap  Dump Trailer .

In civil engineering, it often works in conjunction with excavators, loaders, belt conveyors and other Construction Machinery. The dump trailer carriage adopts rear-dump and side -dump self-unloading methods, which improves the efficiency of the bulk cargo transport by the loader. The semi truck trailer tipper carriage is inclined at a certain angle, so that the cargo in the carriage is unloaded. The power of the Dump Truck Trailer engine is used to complete the dumping mechanism.


2. What are the common types of dump trailers?

There are four types of tipper Semi Trailer : rear tipping semi trailers, side rock Dump Semi Trailer , skeleton dump trailer, and flatbed type tipping trailer.

What are the tonnages of hydraulic dump trailer?

The tilt chassis trailer manufacturer`s hydraulic dump trailer can be customized from 15 tons to 80 tons, 80 tons to 120 tons,  120 tons-180 tons of different tonnage according to the different cargoes.

The volume of the tipper semi trailer can be customized according to the needs of the customers. The common volumes are 30 cubic meters, 32 cubic meters, 35 cubic meters, 45 cubic meters, 50 cubic meters, 60 cubic meters, 80 cubic meters and so on. Such as 15m and 20m3 tipper trailer for sale.

 

3. CHVM dump tipper semi trailers transportation

To prevent the tipper semi trailer paint from being corroded by seawater, we spray a layer of wax on the surface of the dump trailer before shipping, and then seal it with a waterproof rain cloth.


4. Components of the hydraulic lifting system of end dump trailer

The rear tipping semi-trailer train is mainly composed of a tractor and a semi-trailer. The tractor is connected by a saddle and a semi-trailer to form a semi-trailer train. The rear dump trailer hydraulic lift system is mainly composed of power take-off (transmission), hydraulic pump, lift valve, pneumatic control valve, limit valve, hydraulic cylinder, hydraulic oil tank, high (low) pressure oil pipe and so on.

Rear trailer hydraulic lifting principle: Operate the tractor tipper trailer transmission power take-off device to drive the hydraulic pump.The hydraulic pump sucks the hydraulic oil in the hydraulic oil tank through the low-pressure oil inlet pipe and generates high-pressure oil for output.

The high-pressure oil output by the gear pump enters the poppet valve through the high-pressure oil pipe.

The lift valve sends high pressure oil to the oil cylinder or discharges it into the hydraulic oil tank under the control of the air control valve, thereby achieving the functions of lifting, stopping and lowering the hydraulic oil cylinder.


5. Operating instructions of the hydraulic lifting system of end dump trailer

(1) CHVM lifting 20/28ft adjustable custom container chassis trailer hydraulic system lifting operation sequence: Open the tarpaulin or box lid on the trailer--Open the rear door lock--Press the clutch with the transmission in neutral and wait 5 seconds--Hanging low gear (below 4 gears)--Place the handle of the air control valve in the raised position--The dump trailer starts to lift after releasing the clutch, The engine throttle can be properly depressed but it must be controlled within 1500 rpm-when the cylinder reaches the maximum stroke or the limit valve is activated, the air control valve handle is in the stop position.

(2) Rear tipping trailer descending operation sequence: Step on the clutch and wait 5 seconds--Adjust PTO--Adjust transmission gear--Release the clutch--Turn the handle of the air control valve slowly from the stop position to the down position--When you fully lower the car body, wait for 30 seconds and put the handle of the air control valve in the stop position.

6. Precautions for operating the hydraulic lifting system of heavy duty dump trailers

(1) The hydraulic tank of the Titan end dump trailer auction is a special lifting cylinder. Don`t use the cylinder as a stable support for the dump trailer body.

(2) Do not leave the cylinder exposed to the air for more than 2 hours (more than 30 minutes in humid air) in a lifted state, otherwise it will cause oxidation and rust of the cylinder;


(6) During the lifting operation, the operator cannot leave the operating position, and no one can stand or walk in the vicinity of the work area;

(7) During the lifting operation,  the operator must pay attention to the influence of lateral wind, because the long body of the dump semi-trailer will cause the dumper trailer to roll over under the effect of lateral wind;

(8) Don`t make the height of the cargo exceed the back door. Be sure to open the rear door locking device before lifting and unloading, otherwise the cargo will be crowded at the rear of the tractor tipping trailer and the vehicle will tip over when unloading;

(9) When unloading at temperatures below 0 degrees, it is important to pay attention to whether the cargo frozen, otherwise the rear dump semi trailer will roll over due to imbalance between left and right when unloading;

(10) Do not move the dump tipper while the dump trailer is in the lifted state, and don`t use the emergency braking method to unload sticky goods, otherwise it will cause the tractor tipping trailer to roll over or damage the oil tank;

(11) If the lifting angle of the box reaches about 25 degrees, and the cargo in the box has not been unloaded, please stop lifting and check the cause of stickiness;

(12) If the anticipation that a rollover may occur during lifting, be sure to stop lifting and drop the tipper semi trailer slowly;

(13) Wait for about 30 seconds after the schmitt dump tipper body completely lower. Make sure to keep the handle of the air control valve in the stop position. Do not start the heavy duty dump trailer in the lowered position. Do not drive the dump trailers in the lowered position. Otherwise, all the hydraulic oil in the hydraulic cylinder will flow back into the hydraulic tank, causing cavitation and Fuel injection problem.

 

7. Maintenance Specifications for rock dump trailer Hydraulic Lifting System

(1) The new hydraulic dump trailer should be slowly raised during the running-in period. In principle, we should control the engine speed at about 1000 rpm, and it should not exceed 1500 rpm after the running-in period;

(2) Due to the existence of impurities such as iron filings in the hydraulic system during the running-in of the semi dump trailers, when the side tipper trailer is lifted about 300 times, we should replace the hydraulic oil and clean the hydraulic oil box in time;

(3) The high pressure oil pipe must be replaced every two years. In daily maintenance, if you find that the hose is leaking, damaged or partially swollen or cracked, you should replace it in time;

(4) Check the hydraulic oil for discoloration or deterioration every week. If there is any discoloration or deterioration, replace the hydraulic oil in time. Change the oil according to different regions and seasons. Generally, it is more appropriate to change the oil in April and October. When you find that the fuel is insufficient, you should add it in time.

(5) The upper and lower brackets of the oil cylinder need to be filled with grease (butter) in time. It is recommended that the oil cylinder be filled with grease once every 120 times or 15 days. After a long period of non-use, you need to refill the grease once again;

(6) Check the oil return filter element and air filter element inside the hydraulic oil tank for debris clogged and cleaned every half month, and replace the hydraulic oil tank return filter element and air filter element every six months.


(3) It is forbidden to disassemble and adjust the relief valve on the lift valve, otherwise the hydraulic system will lose its safety protection function and cause an accident.

(4) When the dump truck load cargo, we should ensure that the front and back and left and right loading are uniform. If you have too much cargo in front, it can overload the hydraulic system.Too much cargo is loaded behind the trailer, which will cause the vehicle to tip over when unloading, and the left and right partial load will easily cause the cylinder to tip over.

(5) When unloading, please make sure that the ground around the light weight tip trailer is solid and flat, keep the triple axle dump trailer stable, and ensure that the main dump truck and the Scrap Tipper Trailer are in a straight line;




Tipper Semi Trailer

Tipper Semi Trailer,Semi Tipper Trailer,Dump Trailer,Rear Dumper Semi Trailer

Liangshan Changhong Special Purpose Vehicle Manufacturing Co., Ltd. , https://www.chvehicles.com